Declaration of Performance DoP
A Declaration of Performance (DoP) is a self-issued document by the manufacturer that declares a construction product's performance characteristics, it was introduced under the EU Construction Products Regulation (CPR) 305/2011 (replacing the Construction Products Directive (CPD) 89/106/EEC) and coming into force on July 1, 2013.
The 2011 regulations were replaced by the Construction Products Regulation (EU) 2024/3110 published in the Official Journal of the European Union on 18 December 2024 entering into force on 7 January 2025. These new regulations replaced the Declaration of Performance (DoP) with a a Declaration of Performance and Conformity (DoPC), alongside the introduction of the mandatory Digital Product Passport (DPP). The new DoPC includes conformity and includes environmental and climate performance on top of the original technical performance specifications. This is seen as a more comprehensive declaration of a construction product's compliance, and alongside the enhanced CE marking it includes environmental impact, and a greater focus on circular economy principles like promoting recycled materials. The industry has been given one year to become familiar with the new requirements which will come into full force in January 2026.
Both the DoP and the DoPC are legal documents written and issued by the manufacturer stating the product performance in terms of its essential characteristics (for DoP) but also wider issues of conformity (DoPC). Their purpose is to provide standardised information about the product's performance, making it easier to compare different products, that can also feed into Environmental Product Declarations (EPDs). A product can then be CE marked once, previously the DoP was created and in the future after the DoPC has been created, and thus responsibility for the declared performance, and in the future also its conformity.
[edit] Related articles on Designing Buildings
- Articles about products and services.
- Attestation.
- Attestation of conformity.
- BBA becomes an Approved Body for UKCA Marking.
- British Board of Agrément.
- British Standards.
- Building activities definition.
- Building complex.
- Building component.
- Building element.
- Building entities.
- Building spaces definition.
- Building system.
- By-product.
- CE marking.
- CE marking.
- Co-product.
- Constituent construction product.
- Construction Products Regulations.
- National Construction Products Regulator NCPR.
- Construction Products Regulation if there is no Brexit deal.
- Construction Products Reform Green Paper and Consultation.
- Deadline for CE marked products extended to 1 January 2023.
- Energy related products regulations.
- European Technical Approval.
- Intermediate product.
- Kitemark.
- Manufacturer.
- Manufacturer’s certificate.
- National construction products regulator established.
- Office for Product Safety and Standards OPSS.
- Product manufacturers must regain confidence.
- Products v goods v materials.
- Standards.
- Sundry items.
- The Construction Industry Council summarises what to expect from the Construction Products Regulations.
- Third party accreditation.
- UK Conformity Assessed UKCA.
- United Kingdom Accreditation Service UKAS.
Featured articles and news
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description fron the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
























